Select Page

Linear Construction Support

Linear Construction Support

Peak Environmental, A Nova Group GBC company has provided environmental consulting support to many infrastructure and construction projects throughout New Jersey. Peak routinely advises our Clients within the construction industry regarding best management practices for all environmental issues from due diligence, to soil and waste management, and site closure. Peak provided consulting support for New Jersey’s first approved linear construction project (LCP) to comply with the New Jersey Department of Environmental Protection (NJDEP) Linear Construction Technical Guidance (LCTG) document.

The LCTG is applicable to all LCPs that will excavate more than 200 cubic yards of contaminated soil over the duration of the LCP. Peak has prepared documents required by the LCTG and for general construction, including:

    • NJDEP LCP Notification and Final Report Form
    • Health and Safety Plans
    • Materials Management Plan
    • New Jersey Pollution Discharge Elimination System (NJPDES) Discharge to Surface Water (DSW) Permit applications
    • New Jersey Pollution Discharge Elimination System (NJPDES) Discharge to Groundwater Water (DGW) Permit applications
    • Pollution Prevention and Control Plans
    • Site Specific in-situ Waste Classification Sampling Plans for Soil.

Peak has prepared Site Specific Health and Safety Plans in accordance with applicable health and safety concerns for work in and around the contaminated soil at construction Site (metals, volatile organic compounds, base neutral compounds, and suspected historic fill).  Peak also works in coordination with a Certified Industrial Hygienist (CIH) to develop a plan and provide a training session at the Site for the Client’s workers.  Material Handing Plans and Pollution Prevention and Control Plans provide a clear strategy to properly manage all regulated waste encountered to ensure that waste is managed in accordance with all local state and federal regulation, and to ensure that proper waste containment and decontamination procedures are implemented to prevent unpermitted discharge of contamination to the environment.  Peak recommends preparing and implementing an In-Situ Waste Classification Sampling Plan for Soil to ensure soil waste classification is established and waste manifest are prepared prior to excavating contaminated soil to minimize project delays and time soil will remain stockpiled.

Projects

Heating Oil Release, Dutchess County, NY

Peak Environmental, A Nova Group, GBC Company (Peak) was retained to manage the investigation and remediation of heating oil released during a delivery into a basement tank at a professional services building. The oil migrated into underlying material through seams...

Redevelopment Project in Woodbridge, NJ

Peak Environmental, A Nova Group, GBC Company is supporting a remediation project in Woodbridge that razed an approximately 100 year old industrial building that fell into disrepair. Peak completed environmental due diligence, identified specific areas of concern, and...

Redevelopment Project in Newark, NJ

Redevelopment Project in Newark, NJ

Peak Environmental, A Nova Group, GBC Company was retained by a leading real estate developer to conduct environmental due diligence for a property in Newark, NJ. The property was formerly a commercial car park serving Newark Airport travelers. The client saw...

Discuss Your Project

     Contact

    Peak Environmental, A Nova Group, GBC Company

    732-326-1010
    info@peak-environmental.com

    26 Kennedy Blvd, Suite A
    East Brunswick, NJ 08816

    New York projects

    Industries

    Legal
    Real Estate
    Financial
    Insurance
    Petroleum
    Manufacturing
    Materials
    Construction
    Education