Select Page

In-situ Remediation Technologies

In-situ Remediation Technologies

Active remediation is typically required to remediate high level contamination or when a receptor has been or will be impacted by a release. At many properties, access to contamination for active remediation is restricted by site features, there is insufficient space to conduct remedial actions, or remediation activities will disrupt or stop facility operations. In addition, contamination may be relatively deep or have a relatively large footprint, both of which can limit the viability of conventional remediation methods. As a result, remediation technologies capable of treating contamination in place have been developed and improved over the last several decades, making these technologies viable, cost effective alternatives for contaminated soil, groundwater and vapor.

In-situ remediation consists of multiple versions biological, physical/chemical, and thermal remediation technologies applied directly to a defined subsurface zone to break down, remove or stabilize the contaminants. When Peak’s Remedial Alternative Selection (RAS) process identifies in-situ as the most cost-effective option, our remediation professionals consider contaminant type, sample data, subsurface physical characteristics, and property layout to select the best in-situ alternative, or combination thereof, for each project. Peak has expertise and experience in the following technologies.

Physical/Chemical

    • Soil Vapor Extraction
    • Sub-Slab Depressurization
    • Chemical Oxidation
    • Soil Flushing
    • Solidification/Stabilization

Biological

    • Bioventing
    • Aerobic Augmentation
    • Anaerobic Augmentation
    • Natural Attenuation
    • Phytoremediation

Thermal

    • Electrical Resistance Heating (ERH)
    • Steam Injection
    • Conductive Heating

Projects

Heating Oil Release, Dutchess County, NY

Peak Environmental, A Nova Group, GBC Company (Peak) was retained to manage the investigation and remediation of heating oil released during a delivery into a basement tank at a professional services building. The oil migrated into underlying material through seams...

Redevelopment Project in Woodbridge, NJ

Peak Environmental, A Nova Group, GBC Company is supporting a remediation project in Woodbridge that razed an approximately 100 year old industrial building that fell into disrepair. Peak completed environmental due diligence, identified specific areas of concern, and...

Redevelopment Project in Newark, NJ

Redevelopment Project in Newark, NJ

Peak Environmental, A Nova Group, GBC Company was retained by a leading real estate developer to conduct environmental due diligence for a property in Newark, NJ. The property was formerly a commercial car park serving Newark Airport travelers. The client saw...

Discuss Your Project

     Contact

    Peak Environmental, A Nova Group, GBC Company

    732-326-1010
    info@peak-environmental.com

    26 Kennedy Blvd, Suite A
    East Brunswick, NJ 08816

    New York projects

    Industries

    Legal
    Real Estate
    Financial
    Insurance
    Petroleum
    Manufacturing
    Materials
    Construction
    Education