Peak Environmental, A Nova Group, GBC Company has extensive experience investigating and remediating impacted soil, groundwater and vapor at a wide variety of sites ranging from residential properties to large complex industrial facilities. A New Jersey Licensed Site Remediation Professional (LSRP) oversees project planning and implementation of all technical and regulatory activities necessary to advance the project toward closure in compliance with applicable regulations.
Peak routinely prepares and submits site investigation and remediation technical documents that comply with applicable federal and state requirements. The selection of an appropriate remedial strategy is a critical step on the path to case closure. When choosing a remedial strategy, Peak professionals consider Client goals, site characterization data, regulatory requirements, site specific project logistics and natural site conditions, and consider a wide range of remedial technologies. This data and information are utilized to ensure the success of the implemented remedial strategy. Remedial technologies that Peak’s professionals have successfully implemented include:
-
- Electrical resistance heating
- Soil vapor extraction
- Soil Excavation (including sites that require, excavation dewatering, underpinning, sheet pile stabilization, building demolition, etc.)
- Soil Washing
- Soil Stabilization
- Bioremediation (in situ) via direct injection or semi-permeable reactive barrier
- Chemical oxidation (in situ) utilizing hydrogen peroxide, potassium and sodium permanganate via direct injection or semi-permeable reactive barrier
- Chemical reduction (in situ) utilizing Zero-Valent Iron (ZVI) via direct injection or semipermeable reactive barrier
- Groundwater pump and treatment
- Monitored Natural Attenuation (MNA)
- Surfactant Enhanced Aquifer Remediation and LNAPL or DNAPL recovery
- Bio Venting
- Air Sparging
- Sub slab depressurization system
- Ozone Applications
Peak also has extensive experience implementing remedial strategies that are considered administrative solutions by establishing engineering and institutional controls, such as deed notices and aquifer classification exception areas. These options are typically used in conjunction with the active solutions listed above.
Following the successful implementation of remediation activities, Peak prepares all required technical reports in accordance with applicable regulations. For NJ site remediation projects, Peak’s Licensed Site Remediation Professionals (LSRP) for the site will prepare and submit a Response Action Outcome (RAO) document to the responsible party.
Projects
Redevelopment Project, Elizabeth, NJ
Peak Environmental, A Nova Group GBC company (Peak) was retained by a retail company to manage environmental aspects of the redevelopment of a former commercial and industrial property into a 525,000 square foot product distribution facility. The property comprises 35 acres and was...
Thermal Remediation Project, Maplewood, NJ
Peak has managed the characterization and remediation of CVOCs in soil and groundwater at a former razor blade manufacturing facility since 2013. Discharges during operations in the 1950s and 1960s caused contaminant concentrations in soil and groundwater greater than...
Rapid Response, Monmouth County, NJ
Rapid Response, Monmouth County, NJ A petroleum tanker truck was involved in an accident with another tanker truck at a major intersection in Monmouth County, New Jersey. Both tanker trucks lost product and the total released volume was approximately 3,500 gallons of...
Discuss Your Project
Contact
Peak Environmental, A Nova Group, GBC Company
732-326-1010
info@peak-environmental.com
26 Kennedy Blvd, Suite A
East Brunswick, NJ 08816
Industries
Legal
Real Estate
Financial
Insurance
Petroleum
Manufacturing
Materials
Construction
Education