Select Page

Remediation Cost Estimates

Remediation Cost Estimates

Estimating the lifecycle cost estimate of a remediation project is a common task to support evaluation of a property for purchase, to support financing or insurance policy development, to comply with regulatory requirements, to support remedial alternative selection, and other purposes. Peak’s cost estimate model provides the flexibility to meet each of these purposes, and provides options for different remedial outcomes, assumptions regarding contaminant behavior, and variable project durations. 

A common outcome of a Phase I Environmental Site Assessment (ESA) is the determination that an environmental liability is present and can be quantified. Peak can provide a cost-to-cure estimate for the environmental liability present.  A Phase I ESA may determine that an environmental liability is present at the subject site that cannot be quantified without either performing a Phase II investigation or actual remediation of the issue. For these conditions Peak can provide a “worst case scenario” estimate for an environmental issue. 

For release investigations and remediations, Peak can provide cost estimates using compliant methods specified in regulations. Peak professionals utilize their extensive technical and regulatory experience to identify reasonable assumptions on which to determine a likely project path, identify the required steps to complete the path, and assign typical costs to each step. The result is a reliable cost estimate for submittal to regulatory agencies. For property valuation, insurance and financing support, Peak can provide multiple scenarios, likely price ranges and other flexible options to ensure most appropriate costs are assigned to an estimate. Peak managers work closely with our clients to ensure their goals are met. 

Projects

LSRP Services, Gloucester County, NJ

LSRP Services, Gloucester County, NJ

Peak has provided LSRP services since 2013 for a group of companies that sent waste to a former waste transfer station that was abandon by its owner in the 1990s. The former facility accepted and transported solid and liquid industrial waste from numerous...

Historic Fill Management, Totowa, NJ

Historic Fill Management, Totowa, NJ

Peak Environmental, A Nova Group GBC Company (Peak) was retained by a property owner preparing for a transaction to conduct a Site Investigation and Remedial Investigation of mapped Historic Fill.  Following the completion of soil sampling, Peak identified regulatory...

Industrial Site Recovery Act Site, Elizabeth, NJ

Industrial Site Recovery Act Site, Elizabeth, NJ

Peak has been managing the  investigation and remediation of several areas of concern (AOC), including chlorinated solvents in soil and groundwater at the primary Site AOC, at a 20-acre former manufacturing plant serving the electric industry from 1917 to 1995 when...

Discuss Your Project

     Contact

    Peak Environmental, A Nova Group, GBC Company

    732-326-1010
    info@peak-environmental.com

    26 Kennedy Blvd, Suite A
    East Brunswick, NJ 08816

    New York projects

    Industries

    Legal
    Real Estate
    Financial
    Insurance
    Petroleum
    Manufacturing
    Materials
    Construction
    Education