Environmental Remediation
Environmental Remediation
Environmental remediation must result in conditions that are protective of human health, safety, and the environment. The number of applicable remediation options for a given project can be twenty or more, depending on contaminant type media affected, and property use and can range from basic removal to long term, high complexity remediation systems. Therefore, a structured approach to alternative selection is required to support effective decision-making based on information available at the time.
When active remediation is necessary, Peak’s Remedial Alternative Selection (RAS) process provides a comprehensive approach to evaluating alternatives and selecting the best remedial option for a given Site. Evaluated options include multiple variations of physical removal and disposal or treatment, in-situ treatment systems, abiotic destruction & in-situ chemical oxidation (ISCO) injections, aerobic and anaerobic bioremediation amendment injections, and containment technologies, each potentially applicable to soil, groundwater, surface water, sediment, vapor or combinations thereof.
The process considers the effectiveness for contaminants present, client goals, regulatory mandates and restrictions, future use of property, duration and schedule, cost, logistics, accessibility, disruption to operations, and post-remedial requirements. A typical site is evaluated in two steps. Initially, a wide set of remedial alternatives applicable to the type of contaminant and the affected media are screened. Subsequently, potentially applicable alternatives are compared based on a series of detailed evaluation metrics to further reduce the list of best alternatives and rank them.
Costs & Financials Estimate life cycle cost, funding, capital costs, expenses, cash flow
Remedial Objective Success Verify demonstrated effectiveness of alternative
Constructability Confirm logistics and site use, infrastructure proximity
Safety Minimize HSSE risks to team and third parties
Integrity Maximize long-lerm effectiveness/reliability
Related Projects
Peak Environmental promotes Alyssa Cawley & Chelsea Lader!
Alyssa Cawley has been promoted to Project Manager! Alyssa has conducted countless ASTM Phase I Environmental Site Assessments and NJDEP Preliminary Assessment Reports. As a key member of our due diligence group, her work provides clients with innocent purchaser...
Inactive Underground Storage Tank (UST) Systems
When economic conditions, emergency regulations, operation issues, or other variables require an operator to temporarily stop using an underground storage tank (UST) system, certain steps must be taken to ensure compliance. The Underground Storage Tank Rules (NJAC...
Linear Construction during COVID
Roadwork projects are currently proceeding under crisis conditions by Executive Order from the Governor's office, recognizing them as an important contributor to economic activity while maintaining prevention practices to minimize virus transmission. It is important...
Discuss Your Project
Service Areas
Site Remediation
Licensed Site Remediation Professionals
Regulatory Compliance
Phase I / Due Diligence
Contact
Peak Environmental, A Nova Group, GBC Company
732-326-1010
info@peak-environmental.com
26 Kennedy Blvd, Suite A
East Brunswick, NJ 08816
Industries
Legal
Real Estate
Financial
Insurance
Petroleum
Manufacturing
Materials
Construction
Education