Select Page

Waste Characterization

Waste Characterization

Peak’s technical experts, led by a Certified Hazardous Materials Manager (CHMM), routinely identify, characterize and manage solid and liquid waste streams, including hazardous waste, associated with remediation projects, construction projects, industrial facilities, commercial operations, and other sources. Overlapping state and federal waste regulations, and facility specific requirements require a waste characterization plan that satisfies each level. Peak’s experts develop waste plans that satisfy applicable regulations, and ensure that proper recordkeeping, documentation, and reporting are understood and completed for hazardous and non-hazardous wastes. Peak maintains a network of qualified, insured and licensed providers to remove wastes and transport them to their final destination.  Waste characterization is an important component of the following project types.

    • Soil and groundwater remediation with disposal or recycling
    • Facility waste streams, process dismantling, remediation, and capital improvement projects
    • Beneficial Use Determinations
    • Linear Construct Projects
    • Material Acceptance Plans
    • Concrete Re-use
    • Material Characterization Plans
    • Historic Fill investigations
    • Construction Site Services

Additionally, Peak can assess whether listed hazardous waste can be “delisted” and disposed of as non-hazardous waste. Peak can also evaluate a facility’s hazardous waste generator identification to determine the appropriate generator status, and utilize Episodic Generation Permits to reduce the regulatory burden associated with Large Quantity Generator status.

 

Projects

Redevelopment Project, Elizabeth, NJ

Redevelopment Project, Elizabeth, NJ

Peak Environmental, A Nova Group GBC company (Peak) was retained by a retail company to manage environmental aspects of the redevelopment of a former commercial and industrial property into a 525,000 square foot product distribution facility. The property comprises 35 acres and was...

Thermal Remediation Project, Maplewood, NJ

Thermal Remediation Project, Maplewood, NJ

Peak has managed the characterization and remediation of CVOCs in soil and groundwater at a former razor blade manufacturing facility since 2013. Discharges during operations in the 1950s and 1960s caused contaminant concentrations in soil and groundwater greater than...

Rapid Response, Monmouth County, NJ

Rapid Response, Monmouth County, NJ

Rapid Response, Monmouth County, NJ A petroleum tanker truck was involved in an accident with another tanker truck at a major intersection in Monmouth County, New Jersey. Both tanker trucks lost product and the total released volume was approximately 3,500 gallons of...

Discuss Your Project

     Contact

    Peak Environmental, A Nova Group, GBC Company

    732-326-1010
    info@peak-environmental.com

    26 Kennedy Blvd, Suite A
    East Brunswick, NJ 08816

    New York projects

    Industries

    Legal
    Real Estate
    Financial
    Insurance
    Petroleum
    Manufacturing
    Materials
    Construction
    Education