Select Page

Ecological and Receptor Evaluations

Ecological and Receptor Evaluations

A receptor evaluation report is an ongoing compliance evaluation process tool that was designed by NJDEP to facilitate their highest priority:  to ensure the protection of human and ecological receptors on or near a discharge area.  Peak performs receptor evaluations in accordance with NJDEP Technical Requirements for Site Remediation, N.J.A.C. 7:26E.  The evaluation process starts when a discharge is confirmed or ISRA compliance is triggered.  A receptor evaluation is required to be performed for all existing cases and new cases within one (1) year after remediation is initiated.  An evaluation is not required if an unrestricted remedial action is completed within one (1) year of initiation, or if contamination is attributed to and has been documented to be natural background contamination.   Updates to the evaluation are required to be included with each milestone report submittal throughout a remedial investigation and remedial action (Site Investigation Report, Remedial Investigation Report, Remedial Action Report).  The evaluation process ends when remedial action is complete and, in cases where a Remedial Action Permit is required, the biennial certification takes the place of the receptor evaluation.

There are five sections which are evaluated and/or described on a site-specific basis in order to prepare a receptor evaluation report:

    • On site and surrounding property land use, sensitive population evaluation and mapping
    • Description of contamination
    • Groundwater use, well search evaluation and mapping (required when groundwater contamination is detected above Remediation Standards)
    • Vapor intrusion evaluation and mapping (Vapor Intrusion Technical Guidance document)
    • Ecological evaluation and ecological conceptual site modeling

Peak’s professional staff has overseen or contributed to the preparation and submittal of hundreds of receptor evaluations.  Our familiarity and practice with the currently applicable  regulatory and mandatory timeframes, and technical requirements related to filing of receptor evaluations is the industry standard.  We stay on the cutting edge as requirements and forms are updated by NJDEP through attendance of State sponsored and in-house regulatory and compliance training.

If you are the Responsible Party for a site requiring remediation in New Jersey please contact the Environmental Professionals at Peak today to learn more about this and other current and evolving regulatory and mandatory compliance requirements for the remediation of contaminated sites.

Related Projects

Redevelopment Project, Elizabeth, NJ

Redevelopment Project, Elizabeth, NJ

Peak Environmental, A Nova Group GBC company (Peak) was retained by a retail company to manage environmental aspects of the redevelopment of a former commercial and industrial property into a 525,000 square foot product distribution facility. The property comprises 35 acres and was...

Thermal Remediation Project, Maplewood, NJ

Thermal Remediation Project, Maplewood, NJ

Peak has managed the characterization and remediation of CVOCs in soil and groundwater at a former razor blade manufacturing facility since 2013. Discharges during operations in the 1950s and 1960s caused contaminant concentrations in soil and groundwater greater than...

Rapid Response, Monmouth County, NJ

Rapid Response, Monmouth County, NJ

Rapid Response, Monmouth County, NJ A petroleum tanker truck was involved in an accident with another tanker truck at a major intersection in Monmouth County, New Jersey. Both tanker trucks lost product and the total released volume was approximately 3,500 gallons of...

Discuss Your Project

     Contact

    Peak Environmental, A Nova Group, GBC Company

    732-326-1010
    info@peak-environmental.com

    26 Kennedy Blvd, Suite A
    East Brunswick, NJ 08816

    New York projects

    Industries

    Legal
    Real Estate
    Financial
    Insurance
    Petroleum
    Manufacturing
    Materials
    Construction
    Education